Announcement on Recruitment of Suppliers for 60000 Tons Hot Pot Decoction Technological Transformation and Expansion of Power Supply Project in Hongtaiyang East District


Hongtaiyang East District 60000 Tons Hot Pot Decoction Technical Transformation and Expansion of Power Supply Project

Supplier Recruitment Announcement

 

Inner Mongolia grassland red sun food co., ltd. east 60000 tons of hot pot soup technical renovation and expansion of power supply project has met the construction conditions, now the general contractor suppliers of the project are recruited, and qualified suppliers are welcome to sign up.

1. item number: HTY202206

2. Project Name: Hongtaiyang East District 60000 Tons Hot Pot Decoction Technical Transformation and Expansion Power Supply Project

3. Project Overview

1. Power supply project for technical renovation and expansion of 60000-ton hot pot soup in the eastern district of Inner Mongolia grassland Red Sun Food Co., Ltd.: the total power supply capacity is 6050KVA, of which the transformer capacity of workshops 1, 2 and 3 is 1600KVA (reserved for transformer in workshop 3) respectively, and the transformer capacity of the new energy center is 1250KVA, totaling 4 transformers.

2. This recruitment power supply project is the high-voltage power supply part outside the red line of the plant area and the high and low voltage power distribution part in the plant area.

3. The 10KV high-voltage power supply shall be subject to the access point provided by the power supply bureau, and shall be laid overhead with a distance of about 1700 meters.

4. Technical requirements for power distribution equipment:

(1) The high-voltage part of the power distribution room of the energy center uses a single power supply and single bus section (prepared for adding dual power supplies in the future) to design four feed circuits. The DC panel is installed in the power distribution room of the energy center. The power distribution room of the energy center sends out 10KV power supply to each workshop. The power distribution room of each workshop is equipped with transformers. The low-voltage side of the power distribution room of each workshop uses single power supply, single bus and non-segmented mode. The low-voltage power supply part in the distribution room of each workshop is composed of drawer cabinet and GGD cabinet, which are connected by busbar.

(2) The transformer of the energy center is installed in the power distribution room of the energy center. The high-voltage side of the transformer adopts the connection mode of up-out and up-in, and the low-voltage power supply adopts the mode of single power supply and single bus without segmentation.

(3) Substation capacitance compensation cabinet: power factor compensation adopts low-voltage centralized compensation method, equipped with reactors; automatic power factor compensation capacitor cabinet and low-voltage cabinet are arranged side by side on the low-voltage side of the distribution room, and the power factor is greater than 0.95 through automatic compensation.

(4) The integrated grounding device of the transformer foundation main body installed in this project shall be reliably connected, and the grounding resistance shall be less than 0.5 ohms, and resistance reduction measures shall be taken if necessary.

(5) Handover test of main equipment and setting of high-voltage incoming circuit breaker shall be carried out according to the national standard, and a handover test report of main equipment and debugging report of relay protection device shall be provided.

(6) certificates such as factory certificate, instruction manual and factory test report of power distribution equipment.

(7) Complete the installation, commissioning and power transmission of high and low voltage power distribution equipment.

8. Project construction site: The project construction site is located at No.15, Area C, Yulong Industrial Park, Yuquan District, Hohhot City, Inner Mongolia Autonomous Region.

9. Source of funds: self-financing.

10. Planned construction period: August 2022-October 2022.

4. Recruitment Requirements

1. The applicant has the qualification of an independent legal person (business license, registered capital ≥ 10 million yuan), the certificate of legal representative, the power of attorney of the legal representative, the social security payment certificate (2021, 2022) of the bidders, and good credit standing; The enterprise exists in accordance with the law and continues to operate normally (verified by heaven's eyes), has specific electrical engineering construction qualifications, and has corresponding capabilities in personnel, equipment and funds.

2. Financial requirements: good financial position in the past three years (with the financial and accounting statements audited by the audit institution of the accounting firm for 2019-2021, including the balance sheet, cash flow statement, profit statement and financial statement).

3. Performance requirements: I have undertaken the construction performance of similar projects in the past five years (for completed projects, a bid-winning notice, a contract agreement or a completion certificate must be issued, and for projects under construction, a bid-winning notice or a contract agreement must be issued).

4, credit requirements: no bad record (credit China verification).

5, the registration unit is ordered to suspend business; The qualification has been suspended or the qualification of bidding has been canceled by other units; The property has been taken over or frozen; In the last three years, there is a ban on bidding for winning the bid by fraud or serious breach of contract or major project quality problems.

6. If the legal representatives or investors of different registration units are the same person, or there is a holding, investment, or management relationship, they shall not participate in this bidding project at the same time.

7. Joint registration by multiple units is not accepted for this registration, and subcontracting or subcontracting is not allowed. All applicants who meet the above requirements are requested to scan and send photocopies of the above qualification documents with official seals to the zhangyongjun005@126.com mailbox as application materials before 8 o'clock on July 19, 2022.

5. registration time: from 8: 00 on July 13, 2022 to 8: 00 on July 19, 2022.

6. registration method and contact person

Paper documents are not accepted for this application. Eligible applicants are requested to check them online (grassland red sun official website: www.nmhty.com). The deadline for application is 8: 00 on July 19, 2022, strictly based on the email reception time.

Contact person: Zhang Yongjun Tel: 18748118245

7. procurement units and contact information:

Purchasing unit: Inner Mongolia grassland red sun food co., ltd

Business consulting contact: Zhang Yongjun

Contact: 18748118245

8. supervision unit and contact information

Supervision unit: Inner Mongolia grassland red sun food co., LTD. Audit and supervision center

Supervisor: Xin Xiaofeng

Contact: 18047153146

 

Inner Mongolia grassland red sun food co., LTD

12 July 2022

Related News


Yu Wenjun, Chairman of Pharaoyred Sun: From the catering industry to empower the catering industry

In the context of the "double carbon" goal and the continuous deepening of sustainable development strategy, how to organically integrate technology finance and ESG to continuously promote the overall high-quality development of the Yangtze River Delta region? On January 15, the "Yangtze River Delta Technology Finance Integration and ESG Ecology Closed-door Seminar" was held at the Shanghai Museum of Financial Technology.


Key R & D and Achievement Transformation Projects in Autonomous Region Successfully Launched

Relying on the "Notice of Inner Mongolia Autonomous Region Science and Technology Department on Issuing Guidelines for Project Application of 2022 Autonomous Region Key Research and Development and Achievement Transformation Plan (Science and Technology Supporting Ecological Protection and High Quality Development of Yellow River Basin)" project application notice, the "Key Research and Development of Key Technologies and Applications of Deep Processing of Pepper in Tuo County" project jointly applied by our company and Inner Mongolia University of Technology at the beginning of this year was successfully approved on April 17, 2022, with the project funding of 1 million yuan. The successful declaration, implementation and output of the project will further strengthen the promotion of our soft power.


Pan Zhifeng, Director of the Statistics Bureau of the Autonomous Region, and his party went to our company to investigate the statistical work.

On the morning of May 10, 2022, Pan Zhifeng, Party Secretary and Director of the Autonomous Region Statistics Bureau, Tian Xinru, Party Member and Deputy Director of the Autonomous Region Statistics Bureau, Zhang Yongwen, Deputy Mayor of Hohhot, and other leaders came to our company to carry out statistical research. Our executive vice president Yu Xiulin, vice president of finance center Li Haimei, vice president of production center Li Zhichuan, vice president of employee happiness design and administration center Li Yongqiang and other relevant leaders accompanied the investigation.


Our company won the "May 1 Labor Award of the Autonomous Region"

The golden certificate tells the beauty of labor, and hard work holds up the Chinese dream. On April 28, the Inner Mongolia Autonomous Region celebrated the "May 1st" International Labor Day and the May 1st Labor Award Commendation Conference of the Autonomous Region was held at the Conference Center of the Party and Government Office of the Autonomous Region, aiming to commend the economic construction, political construction, cultural construction, and social construction of the autonomous region. Advanced units that have made outstanding contributions to the construction of ecological civilization and party building. Inner Mongolia Prairie Red Sun Food Co., Ltd. was awarded the "May 1st Labor Certificate of Inner Mongolia Autonomous Region" for its years of steady development and social contributions ".


Fu Hongwei, Director of the Information Center of the State Administration for Market Regulation and Deputy Secretary of the Party Committee, and his entourage came to the company to observe and investigate.

On the afternoon of November 27, 2020, Fu Hongwei, Director of the Information Center and Deputy Secretary of the Party Committee of the State Administration for Market Supervision, Hao Xiuchuan, Secretary of the Party Leadership Group of the Autonomous Region Market Supervision Bureau, and Bai Qingyuan, Director of the Autonomous Region Market Supervision Bureau, led relevant leaders of various departments of the Autonomous Region Market Supervision Bureau and 12 autonomous regions An observation group composed of directors and deputy directors of the market supervision bureaus of the league and cities came to the company to investigate the construction of the safety risk management and research. Company President Yu Junlin, Executive Vice President Yu Xiulin, Deputy General Manager Li Guofeng of Production Center, Director Li Toya of Human Resources Administration Center, and Minister Jia Yuebiao of Quality Technology Center accompanied the observation and investigation.


Ouyang Xiaohui, vice chairman of the autonomous region government, and his party came to the company for research.

On the afternoon of November 13, 2020, Ouyang Xiaohui, Vice Chairman of the Inner Mongolia Autonomous Region Government, and his party came to the company to conduct research. Accompanying the investigation were Bai Qingyuan, director of the Market Supervision Administration of the Autonomous Region, Zhang Guoping, member of the party group of the Hohhot Municipal Government and director of the Municipal Major Project Office, Su Yunxi, secretary of the party group and director of the Hohhot Market Supervision Administration, and Naren, deputy head of the Yuquan District Government and other relevant leaders. Company President Yu Junlin, Executive Vice President Yu Xiulin, and Director of Human Resources Administration Li Toya accompanied the investigation and reception.